Featured Projects

Flagship cases that demonstrate our expertise in controlled environments.

ISO 5NOM-016-SSA3-2012Flagship

Hospital Zambrano Hellion - Surgical Clean Room

Hospital Zambrano Hellion (TecSalud)

Design and construction of ISO 5 clean room for surgical area with unidirectional laminar flow, positive pressurization and HEPA H14 filtration system. Flagship project at one of Latin America's most recognized hospitals.

28 weeks·180 m²
ISO 7ISO 14644-1Flagship

UANL - Biomedical Research Laboratory

Universidad Autónoma de Nuevo León

Construction of ISO 7 biomedical research laboratory designed for biological sample handling and medical device testing. Includes airlocked anterooms and real-time particle monitoring system.

29 weeks·240 m²
ISO 7FDA 21 CFR 820Flagship

Medtronic - Production Line Expansion

Medtronic México

Expansion of ISO 7 clean room for new medical device production line. Project executed without stopping existing production, meeting FDA requirements and good manufacturing practice standards.

28 weeks·350 m²
ISO 8NOM-059-SSA1-2015

Pharmaceutical Quality Control Laboratory

Laboratorios Farmacéuticos Confidencial

Design and construction of ISO 8 quality control laboratory for a pharmaceutical company. Includes microbiology, physicochemistry and stability areas, meeting NOM-059-SSA1-2015 standards.

20 weeks·160 m²
ISO 5ISO 14644-1

Semiconductor Plant - Assembly Room

Empresa de Semiconductores (NDA)

Construction of ISO 5 clean room for semiconductor assembly with vertical laminar flow, raised floor with plenum air return and inline particle monitoring system. American-capital project in Nuevo León.

35 weeks·420 m²

Ready for your next clean room?

Our team personally leads every project. Schedule a no-obligation technical visit.

Schedule Technical Visit