Featured Projects
ISO 5NOM-016-SSA3-2012Hospital

Hospital Zambrano Hellion - Surgical Clean Room

Hospital Zambrano Hellion (TecSalud)

Design and construction of ISO 5 clean room for surgical area with unidirectional laminar flow, positive pressurization and HEPA H14 filtration system. Flagship project at one of Latin America's most recognized hospitals.

Key Highlights

  • ISO 5 unidirectional laminar flow
  • HEPA H14 filtration system with 99.995% efficiency
  • Positive pressurization with pressure cascade
  • NOM-016-SSA3-2012 compliance
  • Zero hospital operations interruptions during construction

Project Data

Classification
ISO 5
Standard
NOM-016-SSA3-2012
Area
180
Duration
28 weeks
Industry
Hospital

Ready for your next clean room?

Our team personally leads every project. Schedule a no-obligation technical visit.

Schedule Technical Visit